80 Mil TPO fully adhered membrane roof.
Start to finish 3 days.
6000 ft.² of quarter inch tapered insulation was installed over current 6 inch insulation system adding an overall R-value of our 38 to the existing R26 roof installation.
A half inch dense deck hail-resistant cover board was attached over the insulation assembly then the 80 mil TPO was fully adhered to the dens deck cover board giving this roof assembly Decades of worry-free roof maintenance.
New 24 gauge color clad metal flashing was also installed around the perimeter of the building to give it the final impressive touch.
South Sioux City, NE
Robertson Implement